PROJECT 1 - Thirsk Lake

  • Setup de-watering to maintain clean water flow to creek

  • Setup silt control and temporary sediment ponds

  • Install new trash racks and grates at bottom of dam

  • Install 600mm bypass pipe in channel bottom

  • Clean brush and debris

  • Install concrete tilt-up building over 600mm flotus valve

  • Install inspection and cleaning port in 600mm steel line